Friday, 17 June 2016

 Today we travelled through Wigan Pier on our way to the Wigan Flight after a 7am start.
In total we have done 28 locks meeting no other boats on the Wigan Flight.
This could be due to a lock failure on the Leeds Liverpool Canal.



No comments: