The hard top for the cratch area is coming on, today was a lot of door step engineering to manufacture the top rails for the side curtains.
Whilst back in Essex Ray was putting the top coat on the steel roof, giving it a week to harden before Ray, Craig and Sacha bring it to the boat.
Sunday, 14 December 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment