Saturday, 22 September 2012
Friday, 21 September 2012
Thursday, 13 September 2012
Saturday, 1 September 2012
Last night we moored in Alrewas and as their week for the arts come to an end they were completing a murial on a road bridge over the canal, as you leave Alrewas via a lock you drop on to the river Trent and the bottom picture shows us rejoining the manmade section as the river carries on forward.
Subscribe to:
Posts (Atom)