This is a record of our travels and experiances as we travel on our narrowboat The Maisibert
January 08
Engine room nears completion and systems are tested.
Trims and skirting almost completed
December 07
Wooden flooring laid in the saloon, galley and bedroom
The wood is treated in the engine room and Paul has managed to find a space to store the fold up bikes.
Wood is now treated in the bedroom
November 07
Corner unit oiled and doors fitted
Lockgate stove completely installed,panels oiled and Finrad cover completed
Handles fitted and units oiled
The windows and portholes are serviced and refitted to the boat
Maria has completed the coach lines on the side panels
Maria paints the panels on the side of the boat ready for lining in maroon
October 07
The wardrobe doors in the bedroom have been glazed with mirrors to help create the illusion of space.
The bow doors have been lined and windows fitted
The electrical systems are well under way
Maria has completed the roof just awaiting its non slip coat
Maria painting the final top coat and preparing to paint the side panels in cream
The mooring for The Maisibert are taking shape at Heyford Fields Mariner
Lockgate stove partially installed and holes cut for the windows in the bow doors
The saloon and galley is taking shape
Television unit installed and steps partially made.
Preparations for the installation of the Lockgate stove in the left hand corner of the saloon
Galley nearing completion
Bathroom is nearly completed